Please use this identifier to cite or link to this item: https://dspace.ncfu.ru/handle/20.500.12258/13674
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDemin, M. S.-
dc.contributor.authorДемин, М. С.-
dc.contributor.authorDanilov, M. I.-
dc.contributor.authorДанилов, М. И.-
dc.contributor.authorRomanenko, I. G.-
dc.contributor.authorРоманенко, И. Г.-
dc.contributor.authorAfanasyev, V.-
dc.contributor.authorАфанасьев, В.-
dc.date.accessioned2020-08-31T12:09:50Z-
dc.date.available2020-08-31T12:09:50Z-
dc.date.issued2020-
dc.identifier.citationCepin, M., Demin, M., Danilov, M., Romanenko, I., Afanasyev, V. Power system reliability importance measures // Proceedings of the 29th European Safety and Reliability Conference, ESREL 2019. - 2020. - Pages 1633-1637ru
dc.identifier.urihttp://hdl.handle.net/20.500.12258/13674-
dc.description.abstractThe objective of the paper is to develop a method which can rank the power generation sources by the new reliability importance measures. The ranking may represent the standpoint for the power system operator to reward the power plants which more contribute to reliable power supply and at the same time to penalize the power plants which do not contribute enough. The new importance measures base on the classic loss of load probability evaluation, which is a standardized method for assessing reserve power in order to assure certain level of desired power system reliability and which can be a method for compare power systems reliability. The features of the importance measures as defined within the probabilistic safety assessment of nuclear power plants are used in relation with the loss of load probability calculations. The straightforward algorithm for loss of load probability is considered for smaller power systems and the recursive algorithm is considered for larger power system, where the number of states considered increases over the capacity of the straightforward algorithm. The results show the ranking of power plants as generating units in the power system from a viewpoint of the reliability increase and from the viewpoint of the reliability decrease of the power system, both as a function of reliability of the specific power generating unit. The results depend mostly on the nominal capacity of the power generating unit under investigation, on the forced outage rate of this unit, on the parameters controlling the timely power of this generating unit within the power system and on the load curve of the power system, which can be expressed in terms of daily load diagram or in terms of yearly load diagram depending on the definition of the time period of interestru
dc.language.isoenru
dc.publisherResearch Publishing Servicesru
dc.relation.ispartofseriesProceedings of the 29th European Safety and Reliability Conference, ESREL 2019-
dc.subjectImportanceru
dc.subjectLoss of load probabilityru
dc.subjectPower systemru
dc.subjectReliabilityru
dc.subjectRenewableru
dc.subjectNuclear power plantsru
dc.titlePower system reliability importance measuresru
dc.typeСтатьяru
vkr.instИнженерный институтru
Appears in Collections:Статьи, проиндексированные в SCOPUS, WOS

Files in This Item:
File SizeFormat 
scopusresults 1352 .pdf
  Restricted Access
298.67 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.