Please use this identifier to cite or link to this item: https://dspace.ncfu.ru/handle/20.500.12258/19275
Title: Prevention of proppant removal at the stage of well development after hydraulic fracturing using the wave method
Authors: Verisokin, A. E.
Верисокин, А. Е.
Shesterikova, R. E.
Шестерикова, Р. Е.
Gunkina, T. A.
Гунькина, Т. А.
Keywords: Proppant;Well development
Issue Date: 2022
Publisher: IOP Publishing Ltd
Citation: Verisokin, A. E., Shlein, G. A., Verisokina, A. Yu., Gunkina, T. A. Prevention of proppant removal at the stage of well development after hydraulic fracturing using the wave method // IOP Conference Series: Earth and Environmental Science. - 2022. - Том 990. - Выпуск 1. - Номер статьи 012075. - DOI10.1088/1755-1315/990/1/012075
Series/Report no.: IOP Conference Series: Earth and Environmental Science
Abstract: This article discusses the solution to the problem of active proppant removal from a hydraulic fracture into the wellbore. To reduce the amount of proppant removed not only at the stages of well development, but also during its operation, it is proposed to compact the proppant pack in the created hydraulic fracture with elastic hydraulic waves, which can be generated using a hydraulic spool vibrator. Well treatment according to the technology described in the article makes it possible to attract additional formation fluid to the working agent during hydraulic vibration treatment in field conditions. The use of this technology when testing an exploration well in an oil field has shown high efficiency in terms of increasing its oil production rate.
URI: http://hdl.handle.net/20.500.12258/19275
Appears in Collections:Статьи, проиндексированные в SCOPUS, WOS

Files in This Item:
File SizeFormat 
scopusresults 2100 .pdf
  Restricted Access
831.47 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.