Please use this identifier to cite or link to this item: https://dspace.ncfu.ru/handle/20.500.12258/3591
Full metadata record
DC FieldValueLanguage
dc.contributor.authorVerisokin, A. E.-
dc.contributor.authorВерисокин, А. Е.-
dc.contributor.authorGunkina, T. A.-
dc.contributor.authorГунькина, Т. А.-
dc.contributor.authorMashkov, V. A.-
dc.contributor.authorМашков, В. А.-
dc.date.accessioned2018-12-11T12:56:18Z-
dc.date.available2018-12-11T12:56:18Z-
dc.date.issued2018-
dc.identifier.citationVerisokin, A.E., Gunkina, T.A., Mashkov, V.A. Development of a cutoff valve for thermal-mining oil production // IOP Conference Series: Earth and Environmental Science. - 2018. - Volume 194. - Issue 8. - Номер статьи 082044ru
dc.identifier.urihttps://www.scopus.com/record/display.uri?eid=2-s2.0-85057354913&origin=resultslist&sort=plf-f&src=s&nlo=&nlr=&nls=&sid=538066cefb0babea7df11b07e31a1458&sot=aff&sdt=sisr&sl=174&s=AF-ID%28%22North+Caucasus+Federal+University%22+60070541%29+OR+AF-ID%28%22Stavropol+State+University%22+60070961%29+OR+AF-ID%28%22stavropolskij+Gosudarstvennyj+Tehniceskij+Universitet%22+60026323%29&ref=%28Development+of+a+cutoff+valve+for+thermal-mining+oil+production%29&relpos=0&citeCnt=0&searchTerm=-
dc.identifier.urihttp://hdl.handle.net/20.500.12258/3591-
dc.description.abstractThe paper describes a cutoff valve developed by the authors for thermal-mining method of oil production. The location of the cutoff valve components in the initial position and at the maximum opening of the hydrodynamic link between a borehole cavity and a gathering main are schematically shown. The procedure of installing the cutoff valve in the well bore is given. The cutoff valve is used to equip the wells of high-viscosity oil fields developed via thermal treatment. The design of a cutoff valve for a horizontal well at Yaregskoe field was carried out. The given design proved that the device allows for online fine adjustment and tuning of operating practices (opening and closing pressure) without dismantling. The proposed design will make it possible to increase the quality and efficiency of operating wells at Yaregskoe fieldru
dc.language.isoenru
dc.publisherInstitute of Physics Publishingru
dc.relation.ispartofseriesIOP Conference Series: Earth and Environmental Science-
dc.subjectBoreholesru
dc.subjectHorizontal wellsru
dc.subjectMiningru
dc.subjectMining machineryru
dc.subjectOil fieldsru
dc.subjectOil wellsru
dc.subjectPetroleum prospectingru
dc.titleDevelopment of a cutoff valve for thermal-mining oil productionru
dc.typeСтатьяru
vkr.instИнститут нефти и газа-
Appears in Collections:Статьи, проиндексированные в SCOPUS, WOS

Files in This Item:
File Description SizeFormat 
scopusresults 639 .pdf
  Restricted Access
424.81 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.